CS615-Software Project Management Assignment No 1 Solution 2020


Requirement 1:

In order to achieve a successful software project, we must appreciate what can go wrong and how to do it right. Read the description in the table and identify whether it leads to project failure or success. You are required to mention the success or failure against each description given in the following table and write in the respective column.
Sign of project activities:

  • Success  
  • Failure


No

Description

Answer

1

User are resist to change


2

Power struggle


3

Ambiguous project scope


4

Expectations are realistic


5

Clear statement of requirements


6

User involvement


7

Proper planning


8

Technical illiteracy


9

Expectations are unrealistic


10

Satisfaction of the stakeholders



Requirement 2:

The software procedure (and every software project) is inhabited by players. These players contribute in the software project and perform effective engineering. These players are important for the success of any project. Match the following list of the players with the below mentioned description in the table.


  • Senior Managers.
  • Project Managers.
  • Practitioners.
  • Customers.

Click on Adds for supporting us

Students can download file from here.

Download
Previous Post Next Post